A building permit record is a short, dense description of a job: what is being built, roughly how big it is, who is building it and where it stands. Once you know how to read the fields, a list of permits turns into a list of specific, well-timed reasons to contact a homeowner.
Below, field by field, is what a typical residential permit tells a home-service contractor about the job and when to act.
The fields at a glance
Names and formats vary by city, but the core information is similar.
| Field | Typical example | What it tells you |
|---|---|---|
| Permit number | A code with a year and a type prefix | A unique ID to track the job and deduplicate records |
| Type / work class | "Residential - Pool", "Re-roof", "Alteration" | The trade, and whether the job is new or a repair |
| Description | "New in-ground pool and spa with paver deck" | The details the type field leaves out |
| Valuation | The declared cost of the work | Rough size of the job and of the household's project |
| Contractor | Company name, sometimes a license number | Who you may be competing with, or partnering with |
| Status | Applied, issued, inspections, finaled | Where the job is in its life cycle |
| Dates | Applied, issued, finaled or expired | How fast to act |
| Address / parcel | Street address, ZIP, parcel or folio number | Where to send your offer, and what else is nearby |
Permit number
The permit number is the record's ID, often with a year and a type prefix. Its main practical use is deduplication: the same job can appear on several records (a building permit plus separate electrical or plumbing permits), and the permit numbers let you link or collapse them so a household does not hear from you three times about one project.
Type and work class
This is the most important field for targeting. Cities usually classify each permit by type (building, electrical, mechanical, plumbing) and by work class (new construction, addition, alteration, repair, demolition).
Read the two together:
- New construction means a household that does not exist yet. The buyers move in later and will need everything from window coverings to lawn care.
- Addition or alteration means an existing owner investing in the house, usually a good sign for related upgrades.
- Repair or replacement (a re-roof, an HVAC change-out) usually signals a homeowner fixing a problem, often on a deadline.
- Demolition of a house often comes before a new build on the same lot.
Trade-specific types are the strongest signals. A new residential pool permit points to a household that will soon need pool service and a code-compliant barrier, and may want landscaping and lighting.
Description of work
The description is free text written by the applicant or the city, and it is where the details live: "pool with attached spa", "replace 4-ton AC and furnace", "6 ft wood privacy fence, rear yard". Quality varies widely; some are a full sentence, some are two words.
Scan descriptions for keywords that change your offer. A pool with a spa suggests a different service plan than a plain pool. "Storm damage" in a roofing description says the homeowner is likely dealing with insurance. "Solar with battery" tells a generator installer the household is already thinking about backup power.
Valuation
Valuation is the declared value of the work, usually the applicant's estimate of construction cost. It is not a sale price or an appraisal, and accuracy varies, but it is a useful size signal.
- A high valuation on an addition means a large project; the owners may be open to landscaping, fencing or interior work once construction wraps up.
- A low valuation on a roofing permit may be a partial repair rather than a full replacement.
- Comparing valuations across a neighborhood shows where the bigger projects are.
Not every feed publishes it. Dallas's open-data feed, for example, includes no job values or contractor names at all, so in Dallas the type and description fields carry the weight.
Contractor
The contractor field names the company that pulled the permit, sometimes with a license number. For most marketers this is competitive intelligence: who is busy in which neighborhoods, which builders keep pulling pool permits, which roofers dominate a ZIP code.
It can also be a partnership list. A fence company that sees the same pool builder on dozens of permits has an obvious person to call about referrals. An owner-builder entry, where the homeowner pulls the permit themselves, often means a do-it-yourself household that may still hire out the parts it cannot do.
Status
Status tells you where the job is. The labels vary by city, but most follow a path like this:
- Applied or in review: plans submitted, nothing approved yet.
- Issued: work is allowed to start.
- Inspections: work under way, with inspections at set stages.
- Finaled or completed: the city signed off.
- Expired, withdrawn or cancelled: the job stalled or never happened.
For most trades, issued is the moment that matters. The homeowner has committed and the work is about to start, which is when they are planning what comes next. Records that are only applied for can still change or be withdrawn, and expired records are usually not worth a mailer.
Dates
Permits often carry several dates: applied, issued, last inspection, finaled or expiration. The gap between them tells you about timing.
- Issue date is your clock. Work-adjacent trades (fencing for a pool, gutters for a roof) want to reach the household while the main job is still in progress.
- Final date marks the end of the project, a good moment for maintenance offers: pool service, HVAC tune-ups, roof inspections a year later.
- Inspection sequence can set the order of trades. In Dallas, for example, the local pool code requires the pool barrier to be installed, inspected and approved before the pool is plastered or filled, which is why a fence contractor should reach new pool owners early. Florida's residential code similarly requires the final barrier inspection before the pool is filled; see our guide to Florida pool barrier requirements.
Address and parcel
The address tells you where to send your offer; the parcel or folio number ties the permit to the county's property records. Miami-Dade County, for instance, lets you search permits by address or folio number.
A few practical notes:
- Check the jurisdiction. A county feed may not include permits issued by cities inside the county. Miami-Dade's county feed, for example, covers permits the county issues, not those issued by cities like Miami or Hialeah.
- Watch for partial postal codes. Toronto's open data gives only the first three characters of the postal code, so it works for area targeting but not for addressing mail on its own.
- Owner names vary. Some US feeds (Miami-Dade, Orlando, Fort Worth) include the property owner's name; the Canadian feeds we track do not. Address mail to "Current Resident" or "Homeowner" when in doubt.
Put it together: a worked example
Take a fictional record: an issued residential permit for a new in-ground pool with spa, valued well above the local median, pulled by a pool builder you see often, issued last week on a street of similar homes.
Read that way, it says:
- A pool is going in within weeks, so a barrier will be needed before it is filled.
- The household will need weekly service, chemicals and probably lighting and landscaping.
- The builder is a referral partner worth calling.
That is three specific offers from a single line of public data. When reading permits by hand gets slow, mailing to new permit holders automatically is what Permitnote does; the reading skill is the same either way.
For where to find permits in each city, see how to look up building permits, and for using them in your marketing, building permit leads for contractors.
FAQ
What does "finaled" mean on a building permit?
It means the city has completed its final inspection and signed off on the work. A finaled permit is a closed job, which makes it a good trigger for maintenance and follow-on offers rather than work-adjacent ones.
What is the valuation on a building permit?
It is the declared value of the work, usually the applicant's estimate of construction cost. Treat it as a rough signal of project size, not an exact price, and note that some cities do not publish it.
Can I see who the contractor is on a building permit?
Often, yes. Many permit records list the contractor who pulled the permit, though some open-data feeds leave it out, Dallas's among them. If the field is blank, check the city's own permit search portal, which may show more detail.