New: Los Angeles, Chicago, Charlotte, Las Vegas and more. Now in 32 cities

Market reports

Calgary and Edmonton home permits

Live Calgary and Edmonton home permit data: new homes, renovations, decks, solar and roofing, plus how to reach homeowners when permits show no names.

Calgary issued 1,683 residential permits in the last 30 days and Edmonton issued 1,016. The two Alberta cities are close in size, but their permit data points contractors toward different work: new homes and renovations in Calgary, decks, solar and roofing in Edmonton.

This report compares both open data feeds with data through Nov 18, 2026 and covers how Canadian contractors can reach these households when the permits carry no owner names.

The two cities at a glance

Calgary Edmonton
All residential, last 30 days 1,683 (up 10%) 1,016 (down 5%)
All residential, last 90 days 4,495 3,261
New homes, last 30 days 724 (up 41%) n/a
Renovations, last 30 days 515 (up 4%) 258 (up 13%)
Decks and patios, last 30 days 72 (down 23%) 54 (down 28%)
Solar, last 30 days n/a 113 (down 17%)
Roofing, last 30 days n/a 8 (flat)

"n/a" means that category does not show up as a separate trade in that city's feed as we currently classify it, not that no work is happening. The two cities describe permits differently, so the categories do not line up one to one.

Calgary: new homes and renovations

Week of Aug 31: 213213Aug 31Week of Sep 7: 306306Week of Sep 14: 354354Sep 14Week of Sep 21: 458458Week of Sep 28: 274274Sep 28Week of Oct 5: 405405Week of Oct 12: 335335Oct 12Week of Oct 19: 391391Week of Oct 26: 461461Oct 26Week of Nov 2: 405405Week of Nov 9: 361361Nov 9Week of Nov 16 (in progress): 5858so far

As of Nov 18, 2026, new homes are Calgary's largest residential permit category, with 724 in the last 30 days, up 41%. Calgary's feed is detailed: almost every permit has a project value, so we can report medians.

  • Median new-home permit value (90 days): C$321,709
  • Median renovation permit value (90 days): C$30,000
  • Median deck and patio permit value (90 days): C$7,516
  • Median addition permit value (90 days): C$47,182

These are values declared on the permit, so read them as indicators of project size rather than final costs.

What Calgary's mix means for adjacent trades

New homes. A new-home permit is a household that will move in months later. Builders handle construction, but the owners will buy fences, decks, landscaping, window coverings and often a basement development within the first year or two. The permit is an early signal: note the street, then time your outreach for around possession, not the permit date. Our guide on marketing to new homeowners covers this timing.

Renovations. Calgary issued 515 renovation permits in the last 30 days. Many residential renovations involve interior work such as basements, kitchens and bathrooms. That opens doors for flooring, painting, cabinetry, cleaning after construction and electrical contractors.

Decks and additions. Decks (72 in the last 30 days) and additions (52) signal an owner investing in the outdoor space or the footprint of a home they plan to keep. Landscapers, fence builders and exterior lighting companies are natural follow-ups.

See the Calgary market page for the current permit list.

Edmonton: decks, solar and roofs

Week of Aug 31: 285285Aug 31Week of Sep 7: 236236Week of Sep 14: 294294Sep 14Week of Sep 21: 273273Week of Sep 28: 230230Sep 28Week of Oct 5: 304304Week of Oct 12: 266266Oct 12Week of Oct 19: 220220Week of Oct 26: 267267Oct 26Week of Nov 2: 247247Week of Nov 9: 203203Nov 9Week of Nov 16 (in progress): 7979so far

As of Nov 18, 2026, decks and patios are Edmonton's largest residential category in our data, with 54 permits in the last 30 days, down 28%. Solar (113) and roofing (8) follow.

One caution on Edmonton: its feed has no separate new-home category in our data, and the project values on many deck, solar and roofing permits are in the range of a whole house. Some of those permits are likely parts of new builds rather than standalone projects, so check the permit description before treating one as a renovation lead.

Edmonton's feed also does not include contractor names, and project values are missing on a large share of permits and vary too widely between trades to be a reliable guide, so this report does not quote Edmonton medians.

Solar

Week of Aug 31: 4343Aug 31Week of Sep 7: 4444Week of Sep 14: 5252Sep 14Week of Sep 21: 4444Week of Sep 28: 4040Sep 28Week of Oct 5: 3030Week of Oct 12: 2222Oct 12Week of Oct 19: 1515Week of Oct 26: 2121Oct 26Week of Nov 2: 2929Week of Nov 9: 3333Nov 9Week of Nov 16 (in progress): 1515so far

Edmonton's solar permits, down 17% on the prior month, are one of the more distinctive features of this market. A solar permit tells adjacent trades that a homeowner is focused on energy and long-term costs. Good follow-ups include:

  • Electrical work, such as panel upgrades and EV charger circuits
  • Home batteries, for owners who want to store what they generate
  • Insulation, windows and air sealing, the next step for an efficiency-minded owner
  • Roof maintenance and snow guards, where the installer does not offer them

For solar installers themselves, permits are mostly a view of competitors' activity rather than a lead source; see solar leads without lead marketplaces for approaches that work earlier in the buying cycle.

Roofing and decks

Roofing permits (8, flat) are a strong signal for eavestrough installers, attic insulation, solar and exterior painting. Deck permits are a signal for landscapers, fencing, outdoor lighting and hot tub retailers. Our article on what homeowners buy after a new roof walks through the order in which those purchases usually happen.

See the Edmonton market page for the current list.

The Canadian angle: no names, and the rules on electronic messages

Neither Calgary's nor Edmonton's feed includes the property owner's name. The permit tells you the project and the street, not who lives there. In practice that means:

  • Mail goes to "Current Resident". A postcard addressed this way reaches whoever lives there, which is the person who will decide on the follow-up work.
  • Write for the project, not the person. "Building a deck this year?" or "Your new solar system and your electrical panel" works without a name.
  • Do not try to find the owner's email or phone number to contact them electronically instead.

That last point matters because of Canada's anti-spam law. Canada's anti-spam legislation (CASL) covers commercial electronic messages, including email, social media and text messages. Under section 6 of the Act, a commercial electronic message may only be sent with the recipient's express or implied consent, and it must identify the sender, give a way to contact them, and include an unsubscribe mechanism. A permit record is not consent.

A printed postcard is not an electronic message. Even so, treat it with the same respect: include a clear way to opt out, and honour it. This is general information, not legal advice; check the official sources above or a lawyer for your situation.

What to do this week

  1. Pick the city and trigger that fit your trade. Calgary new homes and renovations for interior and finishing trades; Edmonton decks, solar and roofs for exterior and energy trades.
  2. Choose a few neighbourhoods close to your crews. Routes matter more than reach.
  3. Pull recent permits from the free permit lookup, which shows street names.
  4. Write a postcard for "Current Resident" with one project-specific offer and a tracked phone number or URL.
  5. Time it to the project. Close to the permit date for trades that join during construction; a few weeks later for those that follow it.

Permitnote can handle the mailing, sending a card from your company to new permits in Calgary or Edmonton each week, addressed to the current resident.

FAQ

How many building permits does Calgary issue per month?

In the last 30 days, Calgary issued 1,683 residential permits, up 10% on the previous 30 days. New homes make up a large share as of Nov 18, 2026.

Can I email homeowners who pulled a permit in Canada?

A permit record does not give you consent to send commercial email or texts. CASL requires express or implied consent for commercial electronic messages; the text of the Act is the official source.

Do Edmonton building permits show the owner's name?

No. Edmonton's and Calgary's open permit feeds do not include owner names, which is why permit-based mail in Alberta is addressed to the current resident.

Reach every new new home permit in Calgary.

We mail your offer to each household the week its permit is issued: one card per home, no duplicates. From $149/month + postage.

Get a free sample