The DC Department of Buildings issued 2,908 residential permits in the last 30 days, up 17% on the 30 days before. Washington's rowhouses, semi-detached homes and single-family houses produce a dense, steady mix of alterations, mechanical work, roofs, windows and solar.
This report uses the District's official building permit data, rebuilt nightly, with figures through Nov 18, 2026.
DC at a glance
| Trade | Last 30 days | vs prior 30 days | Last 90 days | Busiest ZIP (30 days) |
|---|---|---|---|---|
| Alterations & remodels | 464 | up 12% | 1,288 | 20002 |
| HVAC & mechanical | 350 | up 6% | 1,137 | 20002 |
| Windows & doors | 115 | up 24% | 308 | 20003 |
| Roofing | 109 | up 4% | 299 | 20002 |
| Deck & patio | 98 | up 13% | 272 | 20011 |
| Solar | 80 | up 10% | 202 | 20020 |
| Fence | 71 | down 1% | 220 | 20002 |
A permit can carry more than one tag, so the rows do not add up to the total.
How the DC data works
DC publishes its permits through the city's open data services, one layer per year, rebuilt every night. The feed has no residential flag, so we decide it from the zoning of the lot and the owner of record: residential zones (detached, semi-detached and rowhouse zones, and rowhouse-flat zones) count, as do rowhouses in apartment zones when the owner is an individual. Downtown, mixed-use, commercial and industrial zones are excluded.
What the feed lacks:
- Job values. It records fees paid but no job value, so this report does not quote median prices.
- A ZIP field. The ZIP is read from the address.
Renewals and extensions of old permits are dropped so they are not counted as new work. This site never shows owner names or house numbers.
Alterations and mechanical work
As of Nov 18, 2026, alterations are the largest category, at 464 permits in the last 30 days, and HVAC and mechanical permits follow at 350. The busiest ZIP right now is 20002 for alterations and 20002 for mechanical work.
Many DC rowhouse renovations include basement work: lowering the floor, adding an entrance and creating a rental unit. Those projects need many trades and run for months. For contractors who are not the GC, the openings are:
- Electrical and plumbing specialists who handle the second unit's separate service
- Waterproofing and drainage for newly finished basements
- Windows, flooring and finishing near the end
- Property management and cleaning for owners who rent the new unit
A mechanical permit on an older rowhouse can mean a heat pump replacing a boiler, a new split system, or a simple equipment swap. The household is a good fit for a maintenance plan, air sealing and insulation. See the DC HVAC permits page.
Roofs, windows and solar
Roofing ran at 109 permits in the last 30 days, windows and doors at 115, and solar at 80. Many DC rowhouses have flat roofs, which makes them practical for solar, and the District has its own incentives for renewable energy. The busiest ZIP for solar right now is 20020.
In DC's historic districts, exterior changes such as windows and visible rooftop equipment can need historic preservation review, which adds time to the job. That longer lead time is useful for follow-up trades: the homeowner is planning, not shopping in a rush. See what homeowners buy after a new roof and solar leads without lead marketplaces.
Fences and decks
Fence permits came in at 71 and deck permits at 98 over the last 30 days. Rear decks and fences on rowhouse lots are small jobs, but they are clear signals: the household is investing in the back yard. Landscapers, lighting installers and gate specialists can follow up. See fence company marketing.
What to do this week
- Choose one trade and two or three ZIPs. DC is compact; a few ZIPs give tight routes.
- Look up recent permits by ZIP with the free permit lookup.
- Fit your offer to the house. Rowhouse owners respond to offers that show you know rowhouses.
- Preview your card with the postcard designer.
- Mail within a week of the permit, and track calls by ZIP.
See the Washington, DC market page for every trade. Permitnote can mail a card from your company to each new matching permit the week it is issued.
FAQ
How many building permits does DC issue a month?
In the last 30 days the DC Department of Buildings issued 2,908 permits we classify as residential, up 17% on the prior 30 days.
Where can I search DC building permits?
The Department of Buildings has an online permit search, and DC's open data portal publishes building permits by year. For a quick view by ZIP, use the permits near me lookup. Our guide on how to read a building permit explains the fields.
Do DC permits show job values?
No. The District's open data includes the fees paid on a permit but not the declared value of the job, so we do not publish median job values for DC.