What is an open permit, and why does it matter when you sell?

An open permit is a building permit that was never closed with a final inspection. What that means for homeowners, buyers and contractors, how permits expire, and how to close one, with Florida's rules as an example.

An open permit is a building permit that was issued but never closed out. The work may have been finished, abandoned halfway, or never started, but the building department's record still shows the permit as active or expired rather than "finaled". Open permits are common, usually fixable, and most often discovered at the worst moment: when a house is being sold or refinanced.

This guide explains how permits get closed, what happens when they are not, and how to deal with one. It is general information, not legal advice. Every jurisdiction sets its own procedures, so check with the building department that issued the permit.

How a permit is supposed to end

A building permit authorizes a specific job. During the work, the building department inspects it at set stages (footing, framing, rough electrical, and so on). When the job is done, the contractor or owner calls for a final inspection. If it passes, the permit is marked finaled, completed or closed, and on new construction or major work a certificate of occupancy or completion may be issued.

If no one calls for the final, or the final fails and is never re-inspected, the permit stays open.

Open, expired and closed

These words get mixed up:

  • Open (active): issued and still valid; work may be under way.
  • Expired: the permit's time ran out before the work was finished and inspected. It is still not closed; the work is simply no longer authorized under that permit.
  • Closed (finaled): passed final inspection.

Permits expire on a clock set by the local code. Many US jurisdictions adopt the International Residential Code, whose model language makes a permit invalid if work does not begin within 180 days of issuance, or if work is suspended or abandoned for 180 days after it starts, with extensions possible at the building official's discretion. Many cities amend those numbers, so the local rule is what counts. The International Code Council publishes the model codes; your city or county website lists its local amendments.

Why open permits cause trouble

  • At sale. Title companies, buyers' attorneys and lenders often run a municipal lien or permit search. An open or expired permit shows up and can delay closing until it is resolved or the parties agree on who will fix it.
  • For the next permit. Some jurisdictions are reluctant to issue a new permit on a property with an unresolved one.
  • Insurance and safety. Work that never passed final inspection may not meet code. An insurer may ask questions after a claim.
  • For the contractor. In many places the permit holder remains responsible for the job until it is closed, and a contractor with many open permits may face scrutiny from the building department.

Florida's rules, as an example

Florida is a good illustration because the Legislature has written specific rules into section 553.79 of the Florida Statutes. Under the 2025 text:

  • A local government may send the property owner a written notice of a permit's coming expiration, by email or mail, at least 30 days before it expires (subsection 1).
  • A property owner may close a permit even if someone else applied for it: by keeping the original contractor or hiring another licensed contractor to finish the inspections, or by acting as an owner-builder. A replacement contractor is liable only for the work it performs (subsection 16).
  • An expired permit whose requirements are substantially complete, as the local agency determines, may be closed without a new permit (subsection 16).
  • A local agency may close a building permit six years after it was issued, even without a final inspection, if it determines that no apparent safety hazards exist (subsection 16).
  • A local agency may not deny a building permit to a new owner, or issue violations or fees to them, solely because a permit applied for by a previous owner was never closed, provided the purchase was at arm's length; the agency keeps its remedies against the original owner and contractor (subsection 17).
  • A contractor may not be denied a permit solely because it is listed on other building permits that were never closed (subsection 17).

Other states handle this differently, and many leave it entirely to local ordinance. Check with your building department rather than assuming Florida's rules apply.

How to check for open permits

  1. Search the permit portal by address. Most cities and counties show each permit with a status. Look for anything that is not finaled, completed or closed. Our guide on how to look up building permits links to official portals.
  2. Ask the building department. Some offer a formal permit history or open-permit search for a fee, which is what title companies typically order.
  3. Read the records carefully. A permit that shows "expired" is still not closed. Our guide on how to read a building permit explains statuses and fields.

How to close an open permit

The usual path:

  1. Find out who pulled it. If a contractor pulled it, contact them first; they are usually the one who must call for the final. See how to find out who pulled a permit.
  2. Ask the building department what is outstanding. Often it is just the final inspection; sometimes an earlier inspection was never done.
  3. Renew or reactivate if needed. Expired permits may need a renewal or a new permit to schedule inspections, with a fee.
  4. Schedule the inspections. Be ready to open walls or provide documentation if earlier stages were never inspected.
  5. Get written confirmation that the permit is closed.

If the original contractor is out of business, many jurisdictions let a new licensed contractor take over the permit, or let the owner finish it as an owner-builder; Florida writes this into its statute, as described above.

For contractors

Open permits are a real business risk and, handled well, a small opportunity. Close your own permits promptly and keep a list. And homeowners trying to sell a house with an open roofing, pool or fence permit often need a contractor to finish and pass inspection quickly.

Permitnote tracks newly issued permits in markets such as Miami-Dade, Orlando and Hillsborough County, which is useful for marketing but is not a permit history: for a specific property's open permits, always use the building department's own records. If you want to reach homeowners with new permits in your trade, the postcard designer and the free permits near me lookup are good places to start.

FAQ

What does it mean when a house has an open permit?

It means a building permit was issued for work on the house but never closed with a passing final inspection. The work may be complete, incomplete or never started; the record just was not closed.

Can you sell a house with an open permit?

Often yes, but it can delay closing. Buyers, lenders and title companies may require the permit to be closed or expect a credit or escrow to cover it. The terms depend on your contract and local rules; talk to your agent or attorney.

Who is responsible for closing a permit?

Usually the permit holder, which is the contractor who pulled it or the owner on an owner-builder permit. After a sale, responsibility can be negotiated between buyer and seller, and some states, such as Florida, limit how a local government can penalize a new owner for a previous owner's open permit.

How long does a building permit last?

It depends on the local code. Model code language voids a permit if work does not start within 180 days or stops for 180 days, but many jurisdictions set their own periods and extensions.