New: Los Angeles, Chicago, Charlotte, Las Vegas and more. Now in 58 cities

Market reports

NYC building permits for houses: solar, new homes and renovations

Live New York City DOB permit data for one- to three-family homes: solar, new homes, renovations and mechanical work by ZIP, with median job values and what they mean for contractors.

New York City's Department of Buildings issued first permits on 1,747 jobs at one-, two- and three-family homes in the last 30 days, up 8% on the 30 days before. Most of the city's housing is apartments, but the houses of Staten Island, Queens, Brooklyn and the Bronx generate a steady flow of household projects, and two categories stand out: rooftop solar and new homes.

This report uses DOB NOW: Build data from NYC Open Data, updated daily, with figures through Nov 18, 2026.

NYC at a glance

Week of Aug 31: 474474Aug 31Week of Sep 7: 378378Week of Sep 14: 418418Sep 14Week of Sep 21: 441441Week of Sep 28: 380380Sep 28Week of Oct 5: 420420Week of Oct 12: 379379Oct 12Week of Oct 19: 422422Week of Oct 26: 385385Oct 26Week of Nov 2: 379379Week of Nov 9: 373373Nov 9Week of Nov 16 (in progress): 188188so far
Trade Last 30 days vs prior 30 days Median job value (90 days) Busiest ZIP (30 days)
Solar 331 up 4% $38,250 10314
New homes 313 down 1% $96,675 10306
Renovation 399 up 8% $78,869 11220
Mechanical (HVAC, boilers) 138 down 12% $54,064 11233
Demolition 96 up 35% $30,420 11361

One filing can cover several kinds of work, so the rows do not add up to the total.

How NYC permit data works

In New York City, a project is filed as a job with DOB, and work permits are issued against that job. We count a job once, on the date its first work permit is issued, and only when the building is a one-, two- or three-family home. That keeps condo towers and apartment buildings out.

Some things are missing by design:

  • Roofs. NYC does not require a DOB permit for ordinary re-roofing, so roofing volume in the data is low and not a useful signal.
  • Like-for-like HVAC swaps. Replacing equipment in kind often needs no DOB filing either, so mechanical counts reflect new systems and larger work, not every change-out.
  • Yard fences. In DOB NOW, "fence" means the temporary construction fence around a job site, so it is ignored.

The data includes the permittee (usually the contractor) and the owner on the filing. This site shows neither owner names nor house numbers.

Solar on NYC houses

Week of Aug 31: 7979Aug 31Week of Sep 7: 7373Week of Sep 14: 7575Sep 14Week of Sep 21: 9393Week of Sep 28: 8888Sep 28Week of Oct 5: 6262Week of Oct 12: 7676Oct 12Week of Oct 19: 8686Week of Oct 26: 8585Oct 26Week of Nov 2: 6060Week of Nov 9: 7070Nov 9Week of Nov 16 (in progress): 3030so far

NYC issued 331 solar jobs on houses in the last 30 days, with a median declared value of $38,250. As of Nov 18, 2026, the busiest ZIP is 10314. Detached and semi-detached houses with usable roofs are concentrated in Staten Island and eastern Queens, and solar follows them.

For contractors, a new solar job on a house means:

  • Battery storage and electrical. Panel upgrades and EV chargers often follow solar.
  • Roof timing. If the roof under the array is old, a roofer who offers detach-and-reset has a future job.
  • Monitoring and cleaning. New owners rarely have a service plan.

See the NYC solar permits page and solar leads without lead marketplaces.

New homes and teardowns

New-home jobs ran at 313 in the last 30 days, with the most in 10306. In New York, new one- to three-family houses are often built on the lot of a demolished older house, which is why demolition (96 jobs) moves alongside new construction. The new-home median of $96,675 is based only on the filings that declare a value, and some declare a value for part of the work, so treat it as a rough marker.

New houses need everything: window treatments, appliances, fencing and gates, landscaping, security and, after closing, a buyer who is new to the house. Our guide on marketing to new homeowners covers timing. See the NYC new home permits page.

Renovations and mechanical work

As of Nov 18, 2026, renovations are the largest category, at 399 jobs in the last 30 days and a median value of $78,869. These are typically larger alterations that need DOB filings: layout changes, kitchens and baths with new plumbing, and conversions. The busiest ZIP is 11220.

Mechanical jobs, covering HVAC systems and boilers, came in at 138. A new heating system in a house is a good moment for a service plan offer, and for insulation or window work that keeps the new system from running all winter.

What to do this week

  1. Choose a borough and two or three ZIPs. Traffic and parking make tight routes essential in New York.
  2. Look up current permits by ZIP with the free permit lookup.
  3. Fit the offer to the job. "Battery backup for your new solar system" or "window treatments for your new home".
  4. Preview your card with the postcard designer.
  5. Mail within a week of the permit, and track by ZIP.

See the New York City market page for every trade. Permitnote can mail your card to each new matching job in your ZIPs the week its first permit is issued.

FAQ

How many solar permits does New York City issue?

In the last 30 days DOB issued first permits on 331 solar jobs at one- to three-family homes, up 4% on the prior 30 days. Solar on apartment buildings and commercial property is not counted.

Do you need a permit to replace a roof in NYC?

Many ordinary re-roofing jobs do not need a DOB permit in New York City, which is why roof work barely shows in DOB data. Some roof work, such as structural changes, does need one; check with the Department of Buildings for a specific job.

Where can I search NYC building permits?

DOB NOW and the Building Information Search let you look up jobs and permits by address, and NYC Open Data publishes the full datasets. Our guide on how to read a building permit explains the common fields.

Reach every new solar permit in New York City.

We mail your offer to each household the week its permit is issued: one card per home, no duplicates. From $149/month + $1.19 per card, printing and postage included.

Get a free sample