New: Los Angeles, Chicago, Charlotte, Las Vegas and more. Now in 58 cities

Guides

New homeowner mailing lists vs permit data: which should contractors use?

How new-mover and new-homeowner mailing lists compare with building permit data for contractors: what each contains, timing, freshness, cost model and which trades suit each.

New homeowner mailing lists tell you who just bought a house. Building permit data tells you who just started a project. If you sell something every household buys after a move, such as lawn care, pest control or security, a new-mover list is a natural fit. If you sell something tied to a specific project, such as a fence after a pool, gutters after a roof or HVAC for an addition, permit data is more precise and usually earlier. Many contractors end up using both.

This guide compares the two on what they contain, how fresh they are, what they cost and which trades each suits.

What a new homeowner list is

List companies compile recent home sales from public deed and mortgage records, sometimes combined with change-of-address and other data, and sell or rent them as "new homeowner" or "new mover" lists. A typical record has a name, mailing address, sale date and sometimes the sale price and property details. You buy or rent the list, often per record or per month, and mail it yourself or through the vendor.

Strengths:

  • Covers resales as well as new construction, so the volume is broad.
  • Includes names, which allows personalized mail.
  • Catches households at move-in, when they are setting up services.

Limitations:

  • Lag. Deed records take time to be recorded and compiled, so the move may be weeks old by the time you mail. Ask each vendor how quickly sales appear on their list.
  • No project information. A list tells you a house sold, not what the owner plans to do with it.
  • Quality varies by vendor. Ask how data is sourced, how often it is updated, and whether you can test a small batch first.

What permit data is

Building permits are public records that cities and counties issue when a homeowner or contractor starts a project: a pool, a roof, a fence, an addition, a new house. Many jurisdictions publish them as open data, often daily. A typical record has an address, the type of work, a description, sometimes a job value and the contractor's name; owner names are included in some places and not in others.

Strengths:

  • Earlier. A permit is issued when a project starts, often before the homeowner has hired the related trades.
  • Project-specific. You know what the household is doing, so your message can be specific: "New pool? You'll need a barrier fence."
  • Fresh. Feeds that update daily let you mail within days.

Limitations:

  • Volume is limited to what your area permits.
  • Data needs cleanup: filtering residential permits, normalizing addresses, removing duplicates.
  • New-home permits come months before move-in, so timing needs thought.

Our guide on how to read a building permit explains each field.

Side by side

New homeowner list Permit data
Signal A home sold A project started
Timing After closing, plus recording and compiling lag When the permit is issued, often daily
Covers resales Yes Only if the buyer pulls a permit
Covers new construction Yes, after sale Yes, months before move-in
Project details No Yes
Names Usually Depends on the jurisdiction
Best for Services every new owner buys Services tied to a specific project

New construction: the overlap

New-home permits and new-homeowner lists overlap on newly built houses, but at different times. The permit shows up months before anyone moves in; the sale record shows up after closing. In the last 30 days, as of Nov 18, 2026:

  • Phoenix, AZ issued 222 new-home permits, up 21% on the month before; the busiest ZIP was 85037.
  • Vancouver, BC issued 66, with a median job value of C$790,000.
  • Douglas County, CO issued 44.
Week of Aug 31: 5454Aug 31Week of Sep 7: 2525Week of Sep 14: 3636Sep 14Week of Sep 21: 5252Week of Sep 28: 3737Sep 28Week of Oct 5: 4343Week of Oct 12: 4242Oct 12Week of Oct 19: 6868Week of Oct 26: 6161Oct 26Week of Nov 2: 4747Week of Nov 9: 2121Nov 9Week of Nov 16 (in progress): 3434so far

Permit data gives you a heads-up: you can see a subdivision filling up and plan a campaign for move-in. A new-mover list confirms who actually moved in. Our playbook on marketing to new homeowners covers how to time it.

Browse current lists on the Phoenix new-home permits page and the Vancouver new-home permits page.

Which trades suit which source

New homeowner lists fit best:

  • Lawn care, pest control, cleaning, security, internet and other services every household sets up after a move.
  • Handyman and painting for resale homes, where buyers often refresh before or right after moving in.

Permit data fits best:

  • Trades that follow a specific project: fences and pool service after pools, gutters and solar after roofs, landscaping after new homes and pools, HVAC after additions.
  • High-ticket trades where precise targeting pays for itself.
  • Contractors who want to arrive before the homeowner starts collecting quotes.

Both together:

  • Pest control and lawn care can use new-home permits to plan neighborhoods and new-mover lists for resales.
  • Home security can pair new-home permits with remodel permits (pre-wire while walls are open) and new-mover lists.

Cost model

New-mover lists are usually priced per record or by subscription, and you pay separately for printing and postage. Permit data is free from the city, but turning it into a clean mailing list takes time or a service. Permitnote does that work and mails the cards: from $149 a month plus $1.19 per card, printing and postage included. Our guide to direct mail cost per lead shows how to compare the options on cost per booked job.

A simple test

  1. Pick one trade and one area.
  2. Mail a small batch from a new-mover list and a small batch from recent permits, with a different tracking number on each.
  3. Use the same offer and card design. You can design your card free with a live preview.
  4. Compare cost per booked job after 60 days.

FAQ

What is the best mailing list for contractors?

It depends on what you sell. New-homeowner lists suit services every new owner buys; permit data suits services tied to a specific project, and it usually reaches the household earlier.

Are new homeowner lists accurate?

Quality varies by vendor. Ask how the data is sourced and how often it is updated, and test a small batch before committing.

Can I get building permit data for free?

Many cities and counties publish permits as free open data. Turning it into a clean mailing list takes filtering and address cleanup. Our permit lookup shows recent residential permits by ZIP in the markets we cover.

Reach every new new home permit in Vancouver.

We mail your offer to each household the week its permit is issued: one card per home, no duplicates. From $149/month + $1.19 per card, printing and postage included.

Get a free sample